Full-time cloud architect or fractional specialist: when each one makes sense
How to choose between hiring a full-time cloud architect and reserving a fractional specialist, with the questions to answer first.
“We can’t hire a full-time cloud architect” is something many companies say once their systems already run on Azure or AWS. Someone has to decide how the infrastructure is designed, secured and paid for, but often the architecture work is not enough to fill a full-time role every month.
This guide helps you choose between the two options based on the kind of decisions your company makes, how often it makes them and who will carry them out.
Timing matters
In our experience as cloud solution architects, supporting development and operations teams, the problem is usually less about technology than about when architecture decisions are made.
- Too early. Without understanding the business needs, the team’s technical maturity or its ability to operate, companies end up implementing oversized solutions. The technology discussion gets ahead of more pressing issues: defining responsibilities, improving code quality, setting up a delivery process and making sure the team can maintain what gets built.
- Too late. The problems are already built into day-to-day operations. In teams working on business applications we have found outdated .NET versions, manual deployments, no continuous integration and delivery, insufficient testing and knowledge concentrated in a few developers. There, modernising starts with understanding dependencies and risks, strengthening engineering practices and preparing the team to sustain the changes. Upgrading versions or setting up a pipeline comes after that.
Architecture needs to arrive before technical decisions turn into costly constraints, and after there is clarity about the problem to solve.
What a cloud architect decides
Architecture work centres on decisions that are expensive to change later:
- How accounts, subscriptions and networks are organised.
- Which services are used for each workload, and why.
- How access, secrets and backups are controlled.
- How a change is deployed and how it is rolled back.
- What it costs to run all of that, and how that cost is watched.
In cloud projects, decisions about identity, access to secrets, connectivity, security and deployments directly affect service availability. A wrong design or an unmanaged operational dependency ends in avoidable incidents.
Part of this work is initial design. The rest is ongoing review: checking what the team builds, adjusting as the company grows and documenting so nothing depends on one person’s memory.
When a full-time architect makes sense
- Architecture decisions come up every day. Several teams build in parallel and every week brings questions that need judgement straight away.
- There is an infrastructure team to lead. Someone has to set standards, review work and develop people.
- The platform is the product. If infrastructure is what your company sells, or the core of its operation, that judgement belongs inside, full time.
In those cases a part-time arrangement falls short and the team ends up waiting for decisions.
When a fractional specialist makes sense
- Decisions matter, but they are not daily. The initial design, a migration, a security or cost review, and then periodic adjustments.
- You have developers but nobody with senior infrastructure experience. The team can build and needs someone to guide and review.
- You are in a transition. Sorting out what grew without a design, preparing a migration or setting standards before growing.
- You want to confirm the need before opening a role. A few months of fractional work show how much architecture work there really is.
How a fractional specialist works
A fractional specialist provides reserved capacity every month. Your company sets the priorities, and the specialist supports decisions and delivers alongside your team. The proposal sets out the capacity, how priorities are set and reviewed, and how coordination with your people works.
It is different from a managed service. In a managed service the firm takes on defined activities and is accountable for them; in the fractional model, direction stays with your company. The differences are explained in engagement models.
How we start and how often it is reviewed
Before committing to a permanent arrangement, you need to understand the real situation. When supporting development teams we work with one-to-one interviews, group sessions, workshops and regular follow-up of commitments. The effort needed depends more on the team’s maturity and the problems to solve than on the size of the organisation.
As a reference, we propose starting with an indicative 8 to 12 hours a week during the first month: architecture sessions, infrastructure review, team support and follow-up on critical decisions. That month is about understanding the situation, identifying the priority risks and building a technical roadmap with concrete deliverables.
Operational commitments are reviewed every week and the time commitment is formally assessed every 30 days, against these criteria:
- Technical risks identified and mitigated.
- Progress in automation and engineering practices.
- Fewer blockers and operational dependencies.
- Agreed technical goals that were met.
- Autonomy reached by the team.
The time commitment can go up during a migration, a critical implementation or a go-live, and come down to occasional reviews once operations settle. What matters is the quality of the decisions it enables and the problems it helps prevent or solve.
What to watch in each option
Full time
- It is a fixed cost, whether or not there are important decisions that month.
- Knowledge concentrates in one person. If they leave, the risk comes back.
- Finding the right profile can take time.
Fractional
- Availability is limited to what is reserved. Urgent work outside that margin is agreed separately.
- It works best with clear priorities and one internal person to coordinate.
- Whatever is decided has to be documented so your team can sustain it.
How knowledge is handed over
A solution is not finished if the team that receives it cannot maintain it. That is why the handover starts on day one: the engineers in charge take part in technical decisions, architecture reviews, implementations and problem solving. Infrastructure as code, pipelines, operating procedures and a record of decisions reduce the dependence on whoever built each part.
When a fractional engagement closes, we work on four components:
- Technical and operational documentation: the architecture in place, dependencies, relevant decisions, procedures and known risks.
- Hands-on handover: sessions with the internal team to walk through the solutions, run operations and handle the usual scenarios.
- Autonomy check: confirming that the people in charge can deploy, read alerts, handle common incidents and maintain the main components.
- Continuity plan: prioritised recommendations, open risks and a roadmap for the next 90 days.
An engagement ends well when the team can keep making good decisions, run its solutions and evolve them on its own.
Five questions before deciding
- How many architecture decisions does your company make in a normal month?
- Who carries out those decisions: an internal team, a provider or nobody?
- What happens today when an important technical decision has no owner?
- Is there design work pending, such as a migration or a new system, or is the work mostly review and adjustment?
- Can you name one internal person to coordinate with an external specialist?
If decisions are few, the team can deliver and someone can coordinate, the fractional model is usually enough. If decisions are constant and there is a team to lead, consider a full-time role, and a fractional engagement can help define that profile before you hire.